Vesgantti 204.7' Oversized Sectional Boneless Couch, Modern 9 Seater Modular Sofa with Chaise, Deep Seat Convertible Plush Corduroy Cloud Couches for Living Room, No Assembly Required, Beige

Vesgantti 204.7' Oversized Sectional Boneless Couch, Modern 9 Seater Modular Sofa with Chaise, Deep Seat Convertible Plush Corduroy Cloud Couches for Living Room, No Assembly Required, Beige

Black-pinstripe Corduroy / 7 Seat & Chaise-204.7'
Sale price  $521.88 Regular price $1,399.99
Skip to product information
Vesgantti 204.7' Oversized Sectional Boneless Couch, Modern 9 Seater Modular Sofa with Chaise, Deep Seat Convertible Plush Corduroy Cloud Couches for Living Room, No Assembly Required, Beige

Vesgantti 204.7' Oversized Sectional Boneless Couch, Modern 9 Seater Modular Sofa with Chaise, Deep Seat Convertible Plush Corduroy Cloud Couches for Living Room, No Assembly Required, Beige

Sale price  $521.88 Regular price $1,399.99
ColorBlack-pinstripe Corduroy
Size7 Seat & Chaise-204.7'

Features & Specs

  • Additional Features : Breathable, Curved Arm, Movable Chaise, No Assembly Required, Non Slip
  • Is Customizable? : No
  • Is Modular : Yes
  • Item Firmness Description : Medium Plush
  • Seat Cushion Configuration : Single Cushion Seat
  • Seating Capacity : 9.00
  • Weight Capacity Maximum : 4950 Pounds

Item details

  • ASIN : B0G2MB5T2Q
  • Additional Features : Breathable, Curved Arm, Movable Chaise, No Assembly Required, Non Slip
  • Brand Name : Vesgantti
  • Included Components : 1 Chaise, 7 Seaters, Poster, User's Manual
  • Indoor Outdoor Usage : Indoor
  • Item Type Name : Sectional
  • Manufacturer : Vesgantti
  • Manufacturer Part Number : Estate Lounge
  • Model Number : Estate Lounge
  • Number of Pieces : 5
  • Orientation : Modular
  • Room Type : Bedroom, Home Office, Home Theater, Living Room, Playroom
  • Seat Cushion Quantity : 9
  • Sofa Type : Sectional
  • UPC : 840452645523

Materials & Care

  • Cushion Construction : High-resilience foam
  • Fill Material : Foam
  • Frame Material Type : Foam
  • Has Removable Seat Cushion Cover : false
  • Material Features : Natural
  • Material Type : Foam
  • Product Care Instructions : Wipe Clean with Dry Cloth
  • Seat Back Fill Material : Foam
  • Seat Fill Material : Foam
  • Upholstery Fabric Type : Corduroy

Measurements

  • Arm Height : 25.6 Inches
  • Item Depth : 112.2 inches
  • Item Dimensions : 112.2 x 204.7 x 35 inches
  • Item Dimensions D x W x H : 112.2'D x 141.7'W x 35'H
  • Item Weight : 71 Pounds
  • Seat Depth : 29.5 inches
  • Size : 7 Seat & Chaise-204.7'

Style

  • Accent Color : Beige
  • Arm Style : Curved
  • Back Style : Pillow Back
  • Color : Beige-plush Corduroy
  • Cushion Style : Boxed Edge
  • Shape : Rectangular
  • Style Name : Modern

User guide

  • Assembly Instructions Description : Included
  • Component Connector Assembly : Not Required
  • Required Assembly : No

You may also like